A Naval Architect is a professional engineer who designs, constructs, and repairs marine vessels such as ships and even offshore structures intended for the purposes of Military and Civil. The entry requirement for this occupation is a bachelor’s degree or higher qualification. In some cases, relevant experience is needed along with the formal qualification.
CDR sample for Naval Architect includes all the required reports such as Curriculum Vitae (CV), Continuing Professional Development (CPD), three Career Episodes (CE), and Summary Statement. The content of the CDR Report Samples is given below:
CDR Sample for Naval Architect
CDR Sample for Naval Architect
Curriculum Vitae (CV)
Continuing Professional Development (CPD)
Naval Architect Career Episode Sample 1:
Naval Architect Career Episode Sample 2:
Naval Architect Career Episode Sample 3:
Naval Architect Summary statement Sample:
Naval Architect Career Episode Sample 1
Project Name: Design and Construction of Two Platform Supply Vessel
In the first Career Episode, the author describes the project titled as “Design and Construction of Two Platform Supply Vessel”, she carried out as a Naval Engineer at VARD VUNG TAU Limited from 17th March 2014 to 10th February 2016. Her responsibilities during this project were:
- To study the general arrangement drawings and building specification already in place.
- To prepare the flow of project by portraying tasks in a diagram.
- To carry out required calculations for the hull structure.
- To use Aveva Marine Software to build the 3D model for the hull structure of the two platform supply vessel.
- To prepare the drawings of the working process for the fabrication of the hull unit.
- To prepare the package of workshop document.
- To produce the Nesting for cutting of steel plate and then sequentially produce the bills of materials (BOM).
- To organize a lightship survey after the structure was ready and do the inclining test.
- To make the as-built drawings.
Naval Architect Career Episode Sample 2
Project Name: Design and Construction of Seven Module Carrier Vessel
In the second Career Episode, the author describes the project titled as “Design and Construction of Seven Module Carrier Vessel”, she carried out as a Naval Engineer at VARD VUNG TAU Limited from 9th May 2016 to 22nd May 2018. Her responsibilities during this project were:
- To prepare Material Take off (MTO) list for purchasing.
- To prepare overall methodology to carry out the project.
- To review all the calculations incorporating the MTO’s list’s building specifications produced earlier to feed them to MS-Excel.
- To prepare the 3D model of the hull structure of seven module carrier vessel using Aveva Marine Software.
- To prepare the working progress drawing for the hull units of seven module carrier for fabrication.
- To prepare the document packaging of the workshop to use during fabrication.
- To prepare the Nesting for steel plate cutting and then generate the Bill of Materials.
- To prepare for vessel launching.
- To conduct the lightship survey leading to the inclining test.
- To prepare the make as-built drawings.
Naval Architect Career Episode Sample 3
Project Name: Design and Construction of One Expedition Cruise Vessel
In the third Career Episode, the author describes the project titled as “Design and Construction of One Expedition Cruise Vessel”, she carried out as a Naval Engineer at VARD VUNG TAU Limited from 5th September 2017 till now. Her responsibilities during this project were:
- To carry out the in depth study regarding the building specification and general arrangement drawing.
- To prepare the material take off (MTO) list since it was necessary for purchasing the required raw materials.
- To build the 3D model for Hull structure by implementing Aveva Marine Software.
- To create the drawings of working process for the fabrication of unit by showing the plan of assembly and methods of building for the hull units.
- To develop the package of workshop document which includes the documents of drawing issued to the production departments for building the unit.
- To prepare the Nesting for the cutting of steel plate for generating the bills of materials by using the auto nesting software.
- To verify that the process of project would be viable both in economic and environmental manners by performing the analysis of CBT.
Free Consultation
Our Strengths
- On Time Delivery
- 24/7 Service
- Plagiarism Free Work
- Domain Specific Writers
- All Engineering Disciplines
- Best Price Guarantee
Give us a call at +61 483 914 303
directly for immediate query and fast assessment!
Feel free to contact our friendly team of writers with any questions you have.